Musi 100-Year Flood
Entire Takbund Road inundated. 3 bridges closed, NDRF deployed. Peak ~3400mm depth. ₹240Cr infrastructure damage.
3400mm48hr18 colonies
Record Monsoon Peak
Highest rainfall since 1916 — 212mm in 24hrs. All approach roads submerged. 2100mm peak flood depth recorded.
2100mm212mm rainRecord
Musi River Backflow
72hr continuous rain (320mm). Musi breached near Chaderghat. NW sector flooded 3 days. GHMC red alert.
1200mm72hr rain3 days
Cyclone Nivar Precursor
Pre-cyclone rainfall caused Musi overflow. Takbund Road submerged ~800mm. 400+ families evacuated from low-lying areas.
800mm400+ evacuated
Flash Flood — Drainage Failure
Urban drainage overwhelmed + reservoir release. Arterial roads flooded within 2hrs. 6 vehicles swept near Amberpet crossing.
500mm2hr onset6 swept